Publications
| September 2013 | Weichen in Fester Fahrbahn mit Fertigteilplatten (Turnouts in Slab Track with precast slabs) |
|
| Der Eisenbahningenieur - EI, 09/2013 | ||
| Eisenbahntechnische Rundschau - ETR, 11/2013 (Walter Antlauf, Josef Hess) | ||
| March 2012 | Weichen auf Fester Fahrbahn (Turnouts on Slab Track) |
|
| Presentation at 56th Conference of Experts, Darmstadt / Germany: Feste Fahrbahn - eine Zwischenbilanz (Slab Track - an interim result) | ||
| March 2008 | Turnouts in High Speed Applications | |
| RTR Special - The German High Speed Rail System, Evolution • Quality Track construction, 03/2008 (Jürgen Haase, Josef Hess, René Brehm) | ||
| March 2008 | Entwicklung und Konstruktion von Weichen (Development and construction of turnouts) |
|
| VDV Schriftenreihe Band 26 Gleisbau: Planung - Bau - Vermessung (VDV writings volume 26 trackwork: Planning - Construction - Survey) (Stephan Gerke, Jürgen Haase und Josef Hess) | ||
| October 2007 | Rail Expansion Joints - The underestimated Track Work Material? | |
| Track-Bridge-Interaction on Highspeed Railways | ||
| University of Porto, Portugal (Editor: Prof. Rui Calçada) | ||
| July/August 2007 | Neuer Standard für Weichen und Schienenauszüge im HGV mit Großeinsatz in Taiwan (New standard for turnouts and rail expansion joints for high-speed traffic – installation in a high-speed track in Taiwan) |
|
| Eisenbahntechnische Rundschau - ETR, 07+08/2007 (Johannes Rohlmann, Josef Hess) | ||
| September 2006 | New standard for turnouts and rail expansion joints for high-speed traffic – installation in a high-speed track in Taiwan | |
| Track System Development, Engineering - Construction - Experiences | ||
| RTR Special - SLAB TRACK, 09/2006 (Johannes Rohlmann, Josef Hess) | ||
| April 2006 | Sonderkonstruktion von Schienenauszügen (Special construction of Rail Expansion Joints) |
|
| Report according enhancements of the Rail Expansion Joint SA60-1200 and elastic base plates for the bridge Hollandsch Diep in the course of the HSL Zuid, The Netherlands (EI –Eisenbahningenieur (57) 4/2006) | ||
| May 2003 | Systementscheidung Schotteroberbau oder Feste Fahrbahn (Systematical decission Ballasted track vs. slab track) |
|
| Final report for investigations in the context of the project "trackwork strategy SMP-T, published by ifv Bahntechnik | ||
| (Project team "Fahrbahnstrategie", DB Systemtechnik, Strategieberatung Fontin & Company, ibt Dr. Ablinger) | ||
| 2001/2002 | Oberbau auf der Neubaustrecke Köln-Rhein/Main - Feste Fahrbahn (Trackwork on the High Speed Line Cologne-Rhine/Main - slab track) |
|
| Eisenbahn-Ingenieurkalender - EIK – 2002 | ||
| (Bringfried Belter, Peter Ablinger, Josef Hess, Gilbert Waldmann) |
